$345,000.00 Construction Cost (phase I and II only on North Side) This project entailed the removal and replacement of the 25 year old glass block window systems from the housing unit day rooms and lower level dorm units and facility storage areas. Due to precast concrete settlement and poor installation issues, the existing glass block units were popping out of the façade. The design solution was to install pre-manufactured solid glass block units in steel framed (egg crate) detention window systems. The units were fabricated off site and installed and welded in two large pieces at each opening. Phase III and IV are scheduled to be completed Spring of 2016.